ESAB MultiPower 460 Pulse Manuál s instrukcemi Strana 47

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 69
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 46
47
SECTION 5 MAINTENANCE
Figure 5-4. No Weld Power
(STICK Position)
Figure 5-5. Meter Display is Blank
No weld power
(Stick position)
Power Light is On
Verify
Weld process in “Stick”
Panel-remote in “Panel”
Standard-Pulse in “Standard
Is voltage at
OTB+ to OTB- =
75 to 80 VDC
IS voltage at
C1 + to C1 -
= 80 VDC
Check external
connections and
components
Is
D1,2,3,4,5,6,
good?
Replace if failed
(See Para. 5.H)
Check and repair
wiring
Replace failed
diodes
Is Q1,Q2,Q3
good?
Replace if failed
(See Para. 5.G)
Is gating signal
(15 VAC) available
at P1-6 to P1-5
(PCB3)?
No
Yes
No
Yes
Yes
No
Yes
Replace Main
Control Board
PCB1
Is gating signal
(15 VAC) available
at P6-3 to P6-2
(PCB3)?
No
No
Meter Display is
blank
Replace Meter
Board (PCB2)
Is the Power
LED on
Check and repair
wiring
Is voltage at
(PCB1
P1-7 to P7-2
= 28VDC
Is voltage at
(PCB2)
P1-1 to P1-2
= 28VDC
Check and repair
wiring
Is voltage at
(PCB1)
P1-3 to P1-4
= 20 VAC
Replace Main
Board (PCB1)
Replace Meter
Board (PCB2)
Yes
No
Yes Yes
No
No
No
Yes
Zobrazit stránku 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 68 69

Komentáře k této Příručce

Žádné komentáře